welcome,guest

Household hybrid power system max 10kW for on/off grid

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-09-28 13:47

  • Browse the number:

    171

Send an inquiries

Company Profile

Shaanxi Kerlimar Engineers Co. Ltd

By certification [File Integrity]

Contact: hyptek(Ms.)  

Email:

Telephone:

Area: Beijing

address: No. 63 Xiying Road, Xi'an, Shaanxi, China (710054)

Website: http://hyptek.shanggaoo.com/

New Products
Product details
Model Number: HK-SYS-05-#1140 Brand Name: OEM Key Specifications/Special Features: Product description:household hybrid power system max 10kw for on/off grid, an independent electric power system, which combines solar, battery, dieselgenerator to support 7x24h electric powerBasic product:3kW/5kw hybrid solar inverterCore technology:
VSG (virtualsynchronous generator) tech

System main features:
--Support grid-tie, grid-interactive, stand-alone, special for on/off grid switch
--Capacity expansion(≥2AC source can be power plus output)
--Synchronized with generator & grid
--Hybrid with generator-save fuel
--Save battery lifespan (PV priority for load, surplus charge for battery)
--Strong on load capacity, inverter alone cansupport air-condition
--Workable even without battery
--Micro grid systemexpandability
7/24h electric power supply
Maximum use of solar energy minimum use of generator solar panel, battery & generator flexible match solar charger & solar inverter integrated
Built-in EMS (hybrid inverter could monitor the demand of load and choose the most efficiency power source)

System feature:
1. Load is connected to inverter side
2. Uninterruptible power supply: when grid or generator is shutdown, HyECO on/off hybrid inverter supplies for load without intermission (3kW maximum)
3. Limited output = Max 6kW/10kw= inverter (3kW/5kw) + grid or generator (no matter how much the power of grid or generator)
4. Built-in EMS (hybrid Inverter could monitor the demand of load and choose the most efficient power sources to supply for load)
Shipping Information:
  • FOB Port: Shanghai
  • Lead Time: 30 - 40 days
Main Export Markets:
  • Eastern Europe
  • Mid East/Africa
  • Central/South America
  • Australasia
  • Western Europe

Download more information about this product